Table of Contents
Task Lists
- Prepare site
- Unpack/Required tools
- Inventory parts
- Check condition
- Physically mount chassis
- Check cable length
- Check air flow ventilation and obstruction
- Check air for contamination, humidity, and temperature
- Mount I/O cards (including IMC I/O)
- Mount PSM cards and IMC card
- Connect bits clocks (if necessary)
- Check voltage
- Install power
- Connect power from chassis to power source
- Check fuses (if used)
- Check voltage
- Check Ready LED
- Configure PC/terminal
- Check software versions and revisions
- Perform FDOS
- Prepare site
- Unpack/Required tools
- Inventory parts
- Check condition of CIM
- Mount the Common Interface Module in rack
- Check cable length
- Check air flow ventilation and obstruction
- Check for air contamination, humidity, and temperature
- Connect 10Base-T between the Common Interface Module and 1600
- Connect other cables
- Check voltage
- Install power from the Common Interface Module to power source
- Check fuses (if used)
- Configure PC/terminal
- FDOS







Posted: Thu Jul 27 12:53:55 PDT 2000
Copyright 1989-2000©Cisco Systems Inc.