cc/td/doc/product/lan/cat4000
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

INDEX

INDEX

Numerics


10BaseT switch management port
description     2-3
pinouts     A-2

A


AC-input power supply
See power supply

airflow
figure     2-6

autonegotiation     6-9

C


cabling
GBIC     5-3

Catalyst 4912G switch
default configuration     6-2
feature overview     1-2
figure     1-1
hardware features     2-2
hardware specifications     A-3
modified commands     6-11
network management features     1-3
new commands     6-5
privileged command mode     6-15
software features     6-2
switch components     2-2
troubleshooting     7-1  to 7-5
unsupported commands     6-5
unsupported features     6-4

CCO     xiii

Cisco Connection Online
See CCO

clear boot command     6-15

commands
modified     6-11  to 6-16
new     6-5  to 6-10
privileged mode     6-15  to 6-16
unsupported     6-5

components, troubleshooting     7-2

configuration guidelines
autonegotiation     6-9
default settings     6-2
Gigabit EtherChannel     6-17

console port
description     2-2
pinouts     A-1

conventions, documentation     x

customer service, contacting     7-5

D


DC power grounding     3-5

Differential Mode Delay
See DMD

DMD
description     5-10

documentation
audience     viii
conventions     x
feedback     vii
organization     viii
related     ix

E


electricity
safety guidelines     4-3
safety warnings     3-4

electrostatic discharge
see ESD

EMI recommendations     3-4

environment requirements     3-1

environmental monitoring, power supply     2-7

ESD, preventing     4-4

Ethernet, supported speeds     1-1

F


fan assembly
description     2-5

features
overview     1-2
unsupported     6-4

flow control     6-3, 6-6

front panel LEDS     2-4

G


GBIC
cabling specifications     5-3
care and handling     5-8
figure     5-2
installing     5-6
media types supported     5-2
patch cord description     5-4
patch cord example     5-5
removing     5-7
SC-type connectors     5-9

Gigabit EtherChannel
configuration guidelines     6-18
description     6-17
PAgP     6-17
trunking     6-20

Gigabit Ethernet
autonegotiation     6-9
default port cost     6-2
DMD     5-10
modified commands     6-11
overfilled launch condition     5-11
port information     5-1

Gigabit Ethernet Interface Converter
See GBIC

H


hardware
features     2-2
specifications     A-3

I


installing
GBIC     5-6

installing the switch
attaching L brackets     4-11
checking materials     4-5
lifting the chassis     4-8
preventing ESD     4-4
rack-mount illustration     4-12
rack-mounting procedure     4-9
required tools     4-9

L


L brackets, attaching to switch     4-11

laser transmission, compared to LED transmission     5-11

LED transmission, compared to laser transmission     5-11

LEDs
front panel     2-4
power supply     4-13

lifting the chassis safely     4-8

M


modified commands     6-11

N


network management features     1-3

new commands     6-5

O


organization of manual     viii

overfilled launch condition     5-11

P


PAgP
channel modes     6-18
description     6-17

patch cord, GBIC     5-4

pinouts
console port     A-1
switch management port     A-2

Port Aggregation Protocol
See PAgP

port cost, Gigabit Ethernet     6-2

power requirements
DC grounding     3-5
site preparation     3-3

power supply
description     2-6
environmental monitoring     2-7
LEDs     4-13
troubleshooting     7-4

privileged command mode     6-15

R


rack-mounting the switch
cautions     4-5
equipment guidelines     4-6
illustration     4-12
procedure     4-9

Redundant Power Supply Unit     2-6
See RPSU

related documentation     ix

reload command     6-5

removing
GBIC     5-7

reset button     2-3

reset command     6-16

RPSU     2-6

S


safety
electricity     4-3
overview     4-1
translated warnings     B-1

SC-type connectors
figure     5-9

set boot command     6-15

set cam command     6-16

set port broadcast command     6-5

set port duplex command     6-5

set port flowcontrol command     6-5

set port negotiation command     6-9

set port speed command     6-5

set span command     6-12

set trunk command     6-13

show counters command     6-14

show port broadcast command     6-12

show port command     6-11

show port flowcontrol command     6-7

show port negotiation command     6-10

site planning checklist     3-5

site requirements
DC grounding     3-5
EMI recommendations     3-4
environment     3-1
planning checklist     3-5
power     3-3
safety with electricity     3-4

specifications
GBIC cabling     5-3
switch hardware     A-3

startup sequence, troubleshooting     7-3

switch components
console port     2-2
LEDs     2-4
power supply     2-6
reset button     2-3
switch management port     2-3

switch management port     2-3

switching modules
speeds     1-1

T


tools required for installation     4-9

translated safety warnings     B-1

transmission, laser versus LED     5-11

troubleshooting
components     7-2
contacting customer service     7-5
power supply     7-4
startup sequence     7-3

trunking, Gigabit EtherChannel     6-20

U


unsupported commands     6-5

unsupported features     6-4

W


warnings, translated     B-1

hometocprevnextglossaryfeedbacksearchhelp
Posted: Thu Apr 8 13:49:04 PDT 1999
Copyright 1989-1999©Cisco Systems Inc.