cc/td/doc/product/lan/cat2948
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

index

index

Numerics


1000BaseLX/LH GBICs   4-2

1000BaseSX GBICs   4-2

1000BaseX   1-3

1000BaseZX GBICs   4-2

100BaseT   1-3

100BaseTX RJ-45 connector   3-7

10BaseT   1-3

10BaseT port   1-5

802.1D Spanning Tree   1-4

A


airflow   1-7

autonegotiation   1-3

B


BER   4-9

bit error rate
See BER

boot process
observing LEDs   4-11

C


cabling
multimode fiber-optic   4-9

CCO   xii

CDP   1-4

CGMP   1-4

checklist, site planning   2-6

Cisco Connection Online
See CCO

Cisco Discovery Protocol
See CDP

Cisco Group Management Protocol
See CGMP

CLI   1-3

command-line interface
See CLI

commands
show port   4-8

components
switch   1-5

configuration, patch cord (figure)   4-10

connectors
100BaseTX RJ-45   3-7
GBIC   4-2
SC-type   4-8

console port   1-5
Supervisor Engines I and II   A-1

conventions, document   xi

cooling
See airflow

customer service   5-5

D


DC-input power supplies
connecting system ground   2-4

differential mode delay   C-1

dimensions, chassis
Catalyst 2948G   A-3
Catalyst 2980G   A-5

documentation, related   x

document conventions   xi

E


Ethernet management port
connecting   3-6

Ethernet speeds
1000BaseX   1-3
100BaseT   1-3
10BaseT   1-3

F


fan assembly   1-7

forwarding rate   1-3

frequency, specifications
Catalyst 5002   A-3, A-6

G


GBIC optical power specifications   4-4

GBICs
1000BaseLX/LH   4-2
1000BaseSX   4-2
1000BaseZX   4-2
cabling   4-3
cabling restrictions   4-4
care and handling   4-9
description   1-2
features   4-2
installing   4-1, 4-5
maintaining   4-1
media types   1-2, 4-2
optical power   4-4
port configuration   4-1
removing   4-1, 4-8

Gigabit Ethernet
Ethernet speeds   1-3

Gigabit Interface Converter
See GBICs

grounding   2-4

H


hardware description
power supply   1-8

heat dissipation   2-1
Catalyst 2948G switches   A-3
Catalyst 2980G switches   A-5

I


IEEE 802.1D Spanning Tree   1-4

installing the switch
checking contents   3-2
connecting a terminal to the console and Ethernet management ports   3-6
connecting power   3-6
rack-mounting
Catalyst 5002   3-3
guidelines   3-2
tools required   3-2
troubleshooting   5-1

L


label, chassis serial number   5-5

lasers   C-2

Layer 2 forwarding   1-3

LEDs
description (table)   1-7
front panel   1-6
power supplies   3-6

LEDs, power supply   5-3

M


MAC addresses   1-3

management, software   1-3

management ports   1-5

Media Access Control addresses
See MAC addresses

memory
Catalyst 5002   A-3, A-5

microprocessor
Catalyst 5002   A-3, A-5

multimode fiber-optic cabling
patch cord   4-9

O


overfilled launch condition   C-2

P


packing   B-1

PAgP   1-3

patch cord
configuration (figure)   4-10
description   4-9
installing   4-11

Port Aggregation Protocol
See PAgP

ports
10BaseT   1-5
console   1-5
management   1-5

power
connecting   3-6
requirements   2-1
specifications
Catalyst 5002   A-3, A-5
troubleshooting   5-2

power requirements
site planning
power requirements   2-1

power supplies
description   1-8
internal   1-8
RPSU   1-8
support   1-4
troubleshooting   5-4

power supply
LEDs   5-3
troubleshooting   5-3

procedures
connecting system ground   2-4
connecting to the Ethernet management port   3-6
GBIC installation   4-5
GBIC removal   4-8
patch cord installation   4-11
rack-mounting   3-2
repacking a switch   B-1

protocols
802.1D Spanning Tree   1-4
CDP   1-4
CGMP   1-4

R


rack-mounting   3-2
kit   3-3

related documentation   x

Remote Monitoring
See RMON

repacking   B-1

returns   B-1

RMON   1-4

RPSU
See power supplies

S


serial number, chassis   5-5

show port command   4-8

Simple Network Management Protocol
See SNMP

site planning
checklist   2-6
heat dissipation   2-1

SNMP   1-3

software management   1-3

specifications
Catalyst 2948G switch   A-2
Catalyst 2980G switch   A-5
system   A-1

switch components   1-5

switch features   1-1

switch verification   4-11

system specifications   A-1

T


terminals
connecting to the Ethernet management port   3-6

troubleshooting
contacting customer service   5-5
getting started   5-1
identifying startup problems   5-2
initial boot   5-1
methodology   5-2
power supplies   5-4
power supply   5-3
related documentation   x

V


verifying switch operation   4-11

virtual LANs
See VLANs

VLANs   1-3

VLAN Truck Protocol
See VTP

VTP   1-3

W


weight, chassis
Catalyst 2948G   A-3
Catalyst 2980G   A-5

hometocprevnextglossaryfeedbacksearchhelp
Posted: Fri Mar 31 10:29:49 PST 2000
Copyright 1989 - 2000©Cisco Systems Inc.