cc/td/doc/product/lan/c2900xl/c2900sa3
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

Installation

Installation

This chapter describes how to install your Catalyst 2900 series XL switch. The following topics follow the order in which they are to be performed:


Note Installation procedures for the Catalyst 2916M XL modules are in the Catalyst 2900 Series XL Modules Installation Guide.

Packing List

Check the contents of the box. It should contain the following:

Warnings

These warnings are translated into several languages in the "Translated Safety Warnings" appendix.

Warning
Only trained and qualified personnel should be allowed to install or replace this equipment.
Warning
Read the installation instructions before you connect the system to its power source.
Warning
Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage.
Warning
To prevent the switch from overheating, do not operate it in an area that exceeds the maximum recommended ambient temperature of 113ºF (45ºC). To prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around the ventilation openings.
Warning
The device is designed to work with TN power systems.
Warning
When installing the unit, the ground connection must always be made first and disconnected last.
Warning
This product relies on the building's installation for short-circuit (overcurrent) protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15A U.S. (240 VAC, 10A international) is used on the phase conductors (all current-carrying conductors).
Warning
This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use.
Warning
Care must be given to connecting units to the supply circuit so that wiring is not overloaded.
Warning
A voltage mismatch can cause equipment damage and may pose a fire hazard. If the voltage indicated on the label is different from the power outlet voltage, do not connect the chassis to that receptacle.
Warning
Do not touch the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power cord is connected. For systems without a power switch, line voltages are present within the power supply when the power cord is connected.
Warning
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Warning
Ultimate disposal of this product should be handled according to all national laws and regulations.
Warning
Attach only the Cisco RPS (model PWR600-AC-RPS) to the RPS receptacle.
Warning
Class 1 laser product.
Warning
Avoid exposure to the laser beam.

EMC Regulatory Statements

U.S.A.

U.S. regulatory information for this product is in the front matter of this manual.

Taiwan


Installation Guidelines

When determining where to place the switch, ensure that the following conditions are met:

Installing the Switch

A Catalyst 2900 series XL switch can be installed in a 19-inch or 24-inch standard or telco rack, on a wall, or on a table or shelf. You can mount the switch in a rack or on a wall using the universal mounting brackets supplied with the switch. The illustrations in this section show mounting brackets for the Catalyst 2908 XL switch as an example. The brackets for the other Catalyst 2900 series switches look slightly different.

Installing the Switch in a Rack

This section describes the following steps to install the switch in 19- and 24-inch standard and telco racks:

Removing Screws from the Switch

Depending on your installation, you might have to replace screws in the switch chassis with screws for the mounting brackets. Decide how you are going to mount the switch by reviewing the illustrations in this section. Remove the screws as the first step in attaching the bracket. Figure 3-1 shows the screws to remove, as needed.


Figure 3-1: Removing Screws from the Switch

Attaching the Brackets to the Switch

The bracket orientation and the screws you use depend on whether you are attaching the brackets for a 19-inch or 24-inch rack. Use two of the supplied screws to attach each bracket, according to the following guidelines:

Figure 3-2, Figure 3-3, and Figure 3-4 show how to attach a bracket to one side of the switch. Follow the same steps to attach the second bracket to the opposite side of the switch.


Figure 3-2: Attaching Brackets for 19- and 24-Inch Racks (Front Panel Forward)



Figure 3-3:
Attaching Brackets for 19- and 24-Inch Racks (Rear Panel Forward)



Figure 3-4: Attaching Brackets for 19- and 24-Inch Telco Racks


Mounting the Switch in a Rack

After the brackets are attached to the switch, use the four supplied Phillips machine screws to securely attach the brackets to the rack, as shown in Figure 3-5.


Figure 3-5: Mounting the Switch in a Rack


After the switch is mounted in the rack, attach the power cord to the switch. If you are using the redundant power system (RPS), see the Cisco RPS documentation for installation instructions.

After the power is connected, the System LED turns green, and the switch starts a series of self-tests described in the "Reading POST Results" section of this chapter.

Attaching the Optional Cable Guide

Attaching cable guides is recommended to prevent the cables from obscuring the front panel of the switch and the components of other devices installed in the rack. If the switch is attached to a 19-inch or 24-inch rack, you can attach the optional cable guide to the left or right bracket using the supplied black screw, as shown in Figure 3-6. The
Catalyst 2916M XL cable guide requires two screws.


Figure 3-6: Attaching the Cable Guide

Installing the Switch on a Wall

This section describes the steps required to attach the switch to a wall:

Attaching the Brackets to the Switch

The bracket orientation and the screws you use depend on whether you are attaching the brackets for parallel or vertical wall-mounting. Use two of the supplied screws to attach each bracket, according to the following guidelines:

Figure 3-7 shows how to attach only one side of the switch. Follow the same steps to attach the second bracket to the opposite side of the switch.


Figure 3-7: Attaching Brackets for Parallel and Vertical Wall-Mounting


Attaching the Switch to a Wall

For best support of the switch and cables, make sure the switch is attached securely to a wall stud or to a firmly attached plywood mounting backboard, as shown in Figure 3-8.


Figure 3-8: Attaching the Switch to a Wall


After the switch is mounted in the rack, attach the power cord to the switch. If you are using the redundant power system (RPS), see the Cisco RPS documentation.

After the power is connected, the System LED turns green, and the switch starts a series of self-tests described in the "Reading POST Results" section of this chapter.

Installing the Switch on a Table or Shelf

Follow these steps to install the switch on a table or shelf:

Step 1 Locate the adhesive strip with the rubber feet in the mounting-kit envelope. Attach the four rubber feet to the recessed areas on the bottom of the unit.

Step 2 Place the switch on the table or shelf near an AC power source.

Step 3 Connect the power cord to the switch rear panel and to the power outlet. If you are using the RPS, see the RPS documentation for installation instructions.

After the power is connected, the system LED turns green, and the switch starts a series of self-tests described in the "Reading POST Results" section of this chapter.

Reading POST Results

The eight tests that make up the power-on self-test (POST) ensure that the switch is functioning properly each time it is powered on. When the switch is first turned on and begins its POST, the port status LEDs are all green. As each of the eight tests is run, the port status LEDs, starting with number 1x, turn off. The port status LEDs for ports 2x to 8x each turn off in turn as the system completes a test.

When the POST completes successfully, the port status LEDs blink once and go off, indicating that the switch is operational. If a test fails, the port status LED associated with the test turns amber, and the system LED turns amber.

POST failures are almost always fatal. Call Cisco Systems immediately if the switch does not pass POST. See the "Understanding POST Results" section of the "Troubleshooting" chapter for a test-by-test description of the POST.

Connecting to the Switch Ports

This section provides procedures for connecting to the 10/100 ports, the 100BaseFX ports, and the console port.

Connecting to the 10/100 Ports

The Catalyst 2900 10/100 ports configure themselves to operate at the speed of the device to which they are attached. If the attached ports do not support autonegotiation, you can explicitly set the speed and duplex parameters.

Connecting to devices that do not autonegotiate or that have their speed and duplex parameters manually set can reduce performance or result in no link. To maximize performance, choose one of these methods for configuring the 10/100 ports:

Follow these steps to connect to 10BaseT or 100BaseTX devices:

Step 1 When connecting to servers and workstations, insert a straight-through
Category 5 cable into an RJ-45 connector, as shown in
Figure 3-9.

Step 2 Insert the other end of the cable into the RJ-45 connector of the target device. The port status LED comes on when both the unit and the connected device are turned on.

The port status LED is amber while Spanning-Tree Protocol discovers the topology and searches for loops. This takes about 30 seconds, and then the port status LED turns green.

If the port status LED does not come on, the device at the other end might not be turned on, or there might be a cable problem or a problem with the adapter installed in the attached device. See the "Troubleshooting" chapter for more information.

Step 3 Reconfigure and reboot the connected device as needed.

Step 4 Repeat steps 1 through 3 to connect each device.


Figure 3-9: Inserting the RJ-45 Connector in a 10/100 Port

Connecting to the 100BaseFX Ports

Follow these steps to connect to one of the fixed 100BaseFX ports:

Step 1 Remove the rubber plugs from the fiber-optic port and store them for future use.

Step 2 Insert the connector into the fiber-optic receptacle, as shown in Figure 3-10.

Caution
Do not remove the rubber plugs from the fiber-optic port or the rubber caps from the fiber-optic cable until you are ready to connect the cable. The plugs and caps protect the fiber-optic port and cable from contamination and ambient light.

Figure 3-10: Inserting the SC Connector in a 100BaseFX Port

Connecting a Terminal or PC to the Console Port

Use the rollover cable shipped with the switch to connect a terminal or PC to the console port. The terminal or PC to be connected must support VT100 terminal emulation.

Follow these steps to connect the terminal or PC to the switch:

Step 1 Ensure that your PC or terminal-emulation software is configured to communicate with the switch via hardware flow control.

Step 2 Configure the baud rate and character format of the terminal or PC to match the following default characteristics of the console port:

After you have gained access to the switch, you can change the baud rate of the port from the System Management page of the switch web interface (see the "System Configuration" section of the "Web-Based Management" chapter).

Step 3 Using the supplied rollover cable, insert the RJ-45 connector into the console port, as shown in Figure 3-11. See the "Console Port" section in the "Connectors and Cables" appendix for a description of the pinout.

Step 4 Attach one of these supplied adapters to a PC or terminal:

Step 5 Insert the other end of the supplied rollover cable into the attached adapter.

Step 6 Boot the terminal-emulation program if you are using a PC or workstation.


Figure 3-11: Inserting the RJ-45 Connector in the Console Port

Assigning IP Information to the Switch

You can assign IP information to the switch after you have attached a terminal or PC with emulation software. Once the switch has an IP address, you can continue the configuration through the web-based manager software.

The first time you connect to the switch, the setup program prompts you for an IP address, subnet mask, and default gateway. Have your information ready before you connect to the switch. Contact your system administrator for these numbers and record them here:

Switch IP address

________.________.________.________

Subnet mask (netmask)

________.________.________.________

Default gateway (router)

________.________.________.________

After you have written down the IP addresses you need, follow these steps to assign them to the switch:

Step 1 Attach a terminal or PC with terminal-emulation software to the console port. Ensure that the emulation software is set to receive the default data characteristics of the port (9600, 8, 1, no parity).

Step 2 Enter Y at the first prompt:

Continue with configuration dialog? [yes/no]: y

If this prompt does not appear, enter setup at the command line, and press Return.

Step 3 Enter the switch IP address at the prompt, and press Return:

Enter IP address: IP_address

Step 4 Enter the subnet mask (IP netmask) address, and press Return:

Enter IP netmask: IP_netmask

Step 5 Enter Y at the next prompt to enter a default gateway (router) address:

Would you like to enter a default gateway address? [yes]: y

Step 6 Enter the IP address of the default gateway (router) at the prompt, and press Return:

Enter router IP address: IP_address

The initial configuration displays:

The following configuration command script was created:

interface VLAN1
ip address IP_address IP_netmask
ip default-gateway IP_address
snmp community private rw
snmp community public ro
end

Use this configuration? [yes/no]:

Verify that the addresses are correct, enter Y, and press Return. If the addresses are not correct, enter N, press Return, and begin again at Step 2.

Configuring the Browser for Web Management

You need to configure your browser to use all the features of both the Visual Switch Manager and the Switch Network View software. This section describes how to configure Netscape Communicator and Internet Explorer to be used with this switch.

Configuring Netscape Communicator

Follow these steps to configure Netscape Communicator:

Step 1 Start Netscape Communicator 4.06 or higher.

You can run Visual Switch Manager with Netscape Communicator 4.03.

Step 2 From the menu bar, select Edit>Preferences.

Step 3 In the Preferences window, click Advanced.

Step 4 From the menu bar, select Edit>Preferences.

Configuring Microsoft Internet Explorer

Follow these steps to configure Microsoft Internet Explorer:

Step 1 Start Internet Explorer 4.01.

Step 2 From the menu bar, select View>Internet Options.

Step 3 In the Internet Options window, click Advanced.

Step 4 Click Every visit to the page, and click OK.

Step 5 In the Internet Options window, click Security.

Step 6 Select Java>Java Permissions section, and select Custom.

Click Java Custom Setting, which appears at the bottom of the window.

Step 7 In the Trusted Sites Zone window, click Edit Permissions.

Step 8 In the Security Settings window, click OK.

Step 9 In the Internet Options window, click Security.

Step 10 In the Trusted Sites Zone window, deselect the Require server verification check box.

Step 11 In the Internet Options window, click Apply, and then click OK.

Where to Go Next

After you have assigned an IP address and configured your browser, you have the following options for continuing managing the switch:


hometocprevnextglossaryfeedbacksearchhelp
Posted: Tue May 11 12:06:47 PDT 1999
Copyright 1989-1999©Cisco Systems Inc.