Table of Contents
Index
- AC power
- connecting 4-7
- connecting redundant 4-7
- current 2-3
- input voltage 2-3
- installing power supply 4-3
- powering up 4-9
- removing power supply 4-3
- specifications A-2
- airflow
- internal 2-8
- specifications A-1
- See also exhaust
- cabling
- network connection 2-11
- racks 2-6
- chassis
- components 1-1
- dimensions A-1
- environment 2-8
- environmental monitoring 2-2
- fan assembly 4-15
- figure 1-2
- lifting safely 3-3
- maintenance procedures 4-1
- overview 1-1
- racks 2-4
- site preparation 2-1
- specifications A-1
- warning against stacking 3-4, B-8
- components
- chassis 1-1
- fan assembly 4-15
- removing modules 3-6
- replacing 4-1
- DC power
- connecting 4-13
- connecting redundant 4-15
- installing power supply 4-9
- powering up 4-15
- removing power supply 4-9
- specifications A-2
- terminal block 4-14
- voltage thresholds 2-2
- dimensions, chassis A-1
- documentation
- additional xiii
- audience xii
- organization xii
- related xiii
- software configuration xiii
- electricity safety warnings 3-4
- electromagnetic interference
- See EMI
- electrostatic discharge
- See ESD
- EMI
- compliant A-2, A-3
- interference 2-4
- shielding 3-5
- environment
- See also site environment
- environmental monitoring 2-2
- equipment racks
- See racks
- ESD
- disposable strap 3-7
- grounding strap 3-7
- preventing damage 3-5
- protection 3-6
- exhaust
- precaution 2-9
- See also airflow
- fan assembly
- removing 4-17
- replacing 4-15
- grounding 3-15
- humidity
- specifications (table) 2-10
- installation
- AC power supply 4-3
- chassis 3-11
- confirming 3-17
- DC power supply 4-9
- fan assembly 4-15
- power supplies 3-15, 4-2
- preparing for 2-1
- tools for chassis 3-7
- LEDs
- power supply 4-2
- verifying 4-9
- lifting the chassis 3-3
- monitoring
- environmental 2-2
- parameters 2-2
- thresholds 2-2
- overtemperature protection
- power supply 4-3
- overvoltage protection
- power supply 4-3
- PFC 2-3
- power
- connections 2-11
- grounding 2-11
- power factor corrector
- See PFC
- power supply
- installing 3-15, 4-2
- LEDs 4-2
- overtemperature 4-3
- overvoltage protection 4-3
- removing 3-15, 4-2
- voltage monitoring 2-2
- See also AC power
- See also DC power
- rack-mounting the chassis 3-7
- racks 2-4
- cabling 2-6
- dimensions 2-5
- rack-mount kit 2-4
- ventilation 2-10
- See also rack-mounting the chassis
- radio frequency interference
- See RFI
- removing components
- AC power supply 4-3
- DC power supply 4-9
- fan assembly 4-15
- removing power supplies 3-15
- RFI 2-4
- safety recommendations
- general 3-2
- working with electricity 3-4
- safety warnings
- translated B-1
- site environment
- conditions 2-8
- preparation 2-1
- temperature 2-2
- specifications
- AC power supply A-2
- chassis A-1
- DC power supply A-2
- temperature
- monitoring 2-2
- overheating 2-8
- power supply 2-2
- specifications (table) 2-10
- thresholds 2-2
- tools
- installation
- for chassis 3-7
- for power supply 4-4
- removing
- fan assembly 4-17
- translated safety warnings B-1
- ventilation
- chassis 2-8
- racks 2-10
- voltage
- monitoring 2-2
- thresholds 2-2
- warnings
- against stacking the chassis 3-4, B-8
- translated B-1







Posted: Fri Aug 25 11:04:15 PDT 2000
Copyright 1989-2000©Cisco Systems Inc.