cc/td/doc/product/l3sw/8510/rel_12_0/wx5_11a
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

Configuration Worksheets

Configuration Worksheets

This appendix includes checklists, instructions, examples, and blank worksheets used for the initial installation and maintenance of the chassis. The checklists, worksheets, and log provide reference and history information that might be useful when troubleshooting the chassis in the future.

Following is a list of worksheets in this appendix:

Make copies of these worksheets before continuing, so that you can complete each of the forms and keep them in a safe place for future reference in the permanent site record.

Five-Slot Chassis Installation Checklist

Use the Five-Slot Chassis Installation Checklist to confirm that you have all the information needed to install and configure the chassis, and that all the components are installed and operating correctly. Each item in the Five-Slot Chassis Installation Checklist (Table A-1) should be verified by the person performing the installation and dated for the permanent site record.


Table A-1: Five-Slot Chassis Installation Checklist
Task Verified by Date

Date chassis received

Chassis and all components unpacked

Chassis components verified

Safety recommendations reviewed

Installation Checklist copied

Site Log established and background information entered

Site power voltages verified

Site environmental specifications verified

IP addresses assigned

Required tools available

Network connection equipment available

Chassis mounted in rack

Second (optional) power supply installed

AC power supplies connected to AC sources
(separate lines if required)

All ejector levers checked and secure

Captive installation screws on supervisor engine module; line modules and power supplies checked

Interface cables and devices connected

ASCII terminal attached to the console port

Console port set for 9600 baud, 8 data bits, 2 stop bits, no parity

All power supplies turned ON

PS1 and PS2 power LEDs on for all power supplies

System boot complete (normal LEDs)

Switch processor module operational (status LED on module green)

Port Configuration Worksheet

Use the Port Configuration Worksheet (Table A-2) during the software configuration process. Each heading in the Port Configuration Worksheet should be completed by the person configuring the chassis and kept for the permanent site record. This section contains a sample chassis configuration and the corresponding port configuration forms.


Figure A-1: Sample Chassis Information

Table A-2: Sample Port Configuration Worksheet
Slot/Line Module/Port No. Line Module Type Name

0/0/0

10/100 Base TX

Bldg 1

0/0/1

10/100 Base TX

Bldg 2

0/0/2

10/100 Base TX

Bldg 3

0/0/3

10/100 Base TX

Bldg 4

1/0/0

10/100 Base FX

Server 1

1/0/1

10/100 Base FX

Server 2

1/0/2

10/100 Base FX

Server 3

1/0/3

10/100 Base FX

Server 4

Ethernet

Switch Processor

Ethernet Port (10 Mbps)

AUX 0

Switch Processor

Console 0

Switch Processor

Port Configuration Worksheet Master

You should fill out the blank Port Configuration Worksheet (Table A-3) before starting to configure the chassis.


Figure A-2: Chassis Information

Table A-3: Port Configuration Worksheet
Slot/Line Module/Port No. Line Module Type Name

0/0/0

0/0/1

0/0/2

0/0/3

1/0/0

1/0/1

1/0/2

1/0/3

Ethernet

Switch Processor

Ethernet Port (10 Mbps)

AUX 0

Switch Processor

Console 0

Switch Processor

Site Log

Use the Site Log (Table A-4) to keep a maintenance history of the chassis. A detailed description of actions performed and symptoms observed should be completed by the person performing the maintenance and kept as part of the permanent site record.
Table A-4: Site Log
Date Action Performed or Symptom Observed Initial

Quick Installation Worksheet

The installation and configuration of the chassis can be separated into specific steps. If each step described in the Site Log (Table A-4) is completed, chassis installation should be successful. If the chassis fails to function properly in the first attempt, you can use the Site Log to systematically check that each step was performed correctly.

Copy the Site Log and initial each procedure as it is completed. Each task should be verified by the person performing the installation and dated for the permanent site records.
Table A-5: Quick Chassis Installation Worksheet
Task Completed Date

Rack-mount the chassis

Complete Chassis Installation Checklist

Complete Chassis Component Checklist

Complete Port Configuration Worksheets

Connect cables

Connect power cables

Switch power on


hometocprevnextglossaryfeedbacksearchhelp
Posted: Wed Oct 27 12:12:25 PDT 1999
Copyright 1989-1999©Cisco Systems Inc.