Table of Contents
index
- 1000BaseLX/LH 2-6
- 1000BaseSX 2-6
- 1000BaseZX 2-6
- airflow
- direction 1-3
- direction (figure) 1-3
- fan assembly 1-3
- fan failure 1-3
- specifications A-2
- auxiliary ports
- description 1-2
- specifications B-3
- Catalyst 4908G-L3 switch router
- components 1-1
- labeling 2-15
- specifications A-1
- chassis
- cooling 1-3
- dimensions A-2
- labeling 2-15
- Cisco RPSs
- description 1-3
- LEDs 2-15
- troubleshooting C-4
- commands
- no shutdown 2-13
- show interface 2-13
- shutdown 2-11, 2-13
- components
- fan assembly 1-3
- GBICs 2-6
- power supplies 1-3
- switching A-1
- console ports
- description 1-2
- specifications B-1
- conventions
- cautions x
- description x
- notes x
- warning x
- customer service C-5
- differential mode delay. See DMD
- dimensions
- chassis A-2
- equipment rack 2-4
- DMD
- advantages 2-8
- description 2-7
- occurrences 2-8
- solution 2-9
- documentation
- audience ix
- conventions x
- organization ix
- related xiii
- environmental monitoring
- description 1-4
- power supplies 1-4
- fans
- airflow 1-3
- description 1-3
- failure 1-3
- troubleshooting C-2
- GBICs
- care 2-10
- compliance 2-7
- description 2-6
- handling 2-10
- installation 2-11
- lifetime 2-10
- maintenance 2-10
- plug removal (caution) 2-12
- removing 2-13
- third party vendors (note) 2-6
- Gigabit Ethernet ports
- connecting to 2-13
- connectors 2-13
- specifications B-4
- Gigabit Interface Converters. See GBICs B-4
- heat dissipation
- determining 2-2
- power 2-2
- installing
- GBICs 2-11
- patch cords 2-7
- laser transmission
- description 2-7 to 2-9
- figure 2-9
- L brackets
- attaching 2-5
- attaching (figure) 2-5
- LEDs
- description C-3
- description (table) 2-17
- link 2-15
- link status 2-15
- location 2-15
- port (figure) 2-16
- power supplies 2-15, C-3
- RPSs 2-15
- switching port 2-15
- link status LEDs
- description (table) 2-17
- figure 2-16
- management ports
- auxiliary 1-2
- console 1-2
- figure 1-2
- mounting posts
- dimensions 2-4
- L brackets 2-5
- patch cords
- compliance 2-6
- description 2-6
- installing 2-7
- requirements 2-6
- pinouts
- auxiliary port B-3
- console port B-1
- ports
- auxiliary 1-2
- auxiliary pinouts (table) B-3
- configured 2-15
- console 1-2
- console pinouts (table) B-1
- Gigabit Ethernet 1-2
- labeling 2-15
- numbering 2-15
- numbering (figure) 2-16
- specifications B-1 to B-4
- power
- connecting 2-5
- general requirements 2-2
- heat dissipation 2-2
- loss prevention 2-2
- maximum load (caution) 2-2
- redundant (note) 2-2
- site requirements 2-2
- specifications A-2
- troubleshooting C-2
- power supplies
- description 1-3
- environmental monitoring 1-4
- LEDs C-3
- redundant 1-3
- troubleshooting C-3, C-4
- rack-mounting
- figure 2-5
- guidelines 2-3
- preparing for 2-3
- system 2-3
- redundant power supply units. See Cisco RPSs
- removing
- GBICs 2-13
- screws 2-4
- safety
- preinstall 2-1
- translated warnings D-1
- service and support C-5
- site planning
- general requirements 2-2
- overview 2-2
- specifications
- auxiliary ports B-3
- cable A-1, B-1
- Catalyst 4908G-L3 switch router A-1, B-1
- console ports B-1
- frequency A-2
- GBIC cabling (table) B-4
- Gigabit Ethernet ports B-4
- memory A-1
- power A-2
- status LEDs 2-17
- switch routers. See Catalyst 4908G-L3 switch router
- TAC
- contacting xv
- description xv
- obtaining xv
- Technical Assistance Center. See TAC
- temperature
- ambient 2-2
- environmental monitor 2-2
- thresholds 2-2
- tools, required 2-3
- troubleshooting
- contacting customer service C-5
- methodology C-2
- power supplies C-3, C-4
- warnings
- conventions xi
- description xi
- translated D-1
- weight, chassis A-2







Posted: Mon Jun 5 17:03:04 PDT 2000
Copyright 1989 - 2000©Cisco Systems Inc.