cc/td/doc/product/l3sw/4908g_l3/ios_12/7w515d
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

index

index

Numerics


1000BaseLX/LH   2-6

1000BaseSX   2-6

1000BaseZX   2-6

A


airflow
direction   1-3
direction (figure)   1-3
fan assembly   1-3
fan failure   1-3
specifications   A-2

auxiliary ports
description   1-2
specifications   B-3

C


Catalyst 4908G-L3 switch router
components   1-1
labeling   2-15
specifications   A-1

chassis
cooling   1-3
dimensions   A-2
labeling   2-15

Cisco RPSs
description   1-3
LEDs   2-15
troubleshooting   C-4

commands
no shutdown   2-13
show interface   2-13
shutdown   2-11, 2-13

components
fan assembly   1-3
GBICs   2-6
power supplies   1-3
switching   A-1

console ports
description   1-2
specifications   B-1

conventions
cautions   x
description   x
notes   x
warning   x

customer service   C-5

D


differential mode delay. See DMD

dimensions
chassis   A-2
equipment rack   2-4

DMD
advantages   2-8
description   2-7
occurrences   2-8
solution   2-9

documentation
audience   ix
conventions   x
organization   ix
related   xiii

E


environmental monitoring
description   1-4
power supplies   1-4

F


fans
airflow   1-3
description   1-3
failure   1-3
troubleshooting   C-2

G


GBICs
care   2-10
compliance   2-7
description   2-6
handling   2-10
installation   2-11
lifetime   2-10
maintenance   2-10
plug removal (caution)   2-12
removing   2-13
third party vendors (note)   2-6

Gigabit Ethernet ports
connecting to   2-13
connectors   2-13
specifications   B-4

Gigabit Interface Converters. See GBICs   B-4

H


heat dissipation
determining   2-2
power   2-2

I


installing
GBICs   2-11
patch cords   2-7

L


laser transmission
description   2-7  to 2-9
figure   2-9

L brackets
attaching   2-5
attaching (figure)   2-5

LEDs
description   C-3
description (table)   2-17
link   2-15
link status   2-15
location   2-15
port (figure)   2-16
power supplies   2-15, C-3
RPSs   2-15
switching port   2-15

link status LEDs
description (table)   2-17
figure   2-16

M


management ports
auxiliary   1-2
console   1-2
figure   1-2

mounting posts
dimensions   2-4
L brackets   2-5

P


patch cords
compliance   2-6
description   2-6
installing   2-7
requirements   2-6

pinouts
auxiliary port   B-3
console port   B-1

ports
auxiliary   1-2
auxiliary pinouts (table)   B-3
configured   2-15
console   1-2
console pinouts (table)   B-1
Gigabit Ethernet   1-2
labeling   2-15
numbering   2-15
numbering (figure)   2-16
specifications   B-1  to B-4

power
connecting   2-5
general requirements   2-2
heat dissipation   2-2
loss prevention   2-2
maximum load (caution)   2-2
redundant (note)   2-2
site requirements   2-2
specifications   A-2
troubleshooting   C-2

power supplies
description   1-3
environmental monitoring   1-4
LEDs   C-3
redundant   1-3
troubleshooting   C-3, C-4

R


rack-mounting
figure   2-5
guidelines   2-3
preparing for   2-3
system   2-3

redundant power supply units. See Cisco RPSs

removing
GBICs   2-13
screws   2-4

S


safety
preinstall   2-1
translated warnings   D-1

service and support   C-5

site planning
general requirements   2-2
overview   2-2

specifications
auxiliary ports   B-3
cable   A-1, B-1
Catalyst 4908G-L3 switch router   A-1, B-1
console ports   B-1
frequency   A-2
GBIC cabling (table)   B-4
Gigabit Ethernet ports   B-4
memory   A-1
power   A-2

status LEDs   2-17

switch routers. See Catalyst 4908G-L3 switch router

T


TAC
contacting   xv
description   xv
obtaining   xv

Technical Assistance Center. See TAC

temperature
ambient   2-2
environmental monitor   2-2
thresholds   2-2

tools, required   2-3

troubleshooting
contacting customer service   C-5
methodology   C-2
power supplies   C-3, C-4

W


warnings
conventions   xi
description   xi
translated   D-1

weight, chassis   A-2

hometocprevnextglossaryfeedbacksearchhelp
Posted: Mon Jun 5 17:03:04 PDT 2000
Copyright 1989 - 2000©Cisco Systems Inc.