cc/td/doc/product/dsl_prod/vrmgtsw/vr4w/rel30
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

index

index

A


Active Connections dialog box
description     7-20
field descriptions     7-22

adding pools     2-5

Add Pool Now button     2-5

Add Subscriber button     3-5

administrative state     3-7

aggregates     6-1

assigned ports     2-7

assigning CAP ATU-C ports     3-3

asynchronous transfer mode
See ATM

ATM
edge switch port     6-1
network backbone     6-3

ATM virtual channels
guidelines for configuring     4-1

ATU-C Ports
tab fields     7-18

ATU-C ports
in service     7-14
locking     1-2

ATU-R modem     7-1

B


baud rates     3-8

blocked connections     7-14, 7-15

block time     7-13

boosted signal     7-10

buttons
Add Pool Now     2-5
Add Subscriber     3-5
Delete Pool Now     2-5
Edit Pool     3-5
Edit Subscriber     3-5
Service Provisioning     3-7

C


CAP ATU-C Module Properties dialog box     5-5

CAP ATU-C ports
assigning to a logical pool     3-3

CAP rates     3-8

caution, definition     xiii

changing noise margins     7-2

circuit ID     3-5, 3-7

Cisco 6100 Series system
connection tests     A-1
system pool summary counters     7-13

configuration, testing     A-1

connection counter     7-2

connections
blocked     7-14, 7-15
configuration tests     A-1
counters     7-11
subscriber activity     7-19
subtending     6-2
subtending diagram     6-2
successful     7-13, 7-15
total requests     7-14

counters
connection     7-2, 7-11
system pool summary     7-13
threshold     7-11
training     7-11

CPE
signature     3-8
training     5-1
training rate     7-7

customer premises equipment
See CPE

D


data path tests     6-4

Delete Pool Now button     2-5

deleting
pools     2-5
subscriber PVCs     4-7
subscribers     3-10

deleting subscriber PVCs     4-7

dialog boxes
Active Connections     7-20
CAP ATU-C Module Properties     5-5
LIM Properties Port Configuration tab     3-5
Module Properties Port Configuration tab     5-2
Module Properties Usage State group box     7-19
Performance Management dialog ATU-C ports tab     7-18
Performance Management dialog box Subscriber tab     7-15
Performance Management Line Ports tab     7-16
Performance Management Pool Summary tab     7-13
Pool Properties     2-4
Service Provisioning     4-5
Subscriber Properties     3-6, 4-5, 5-3, 7-5
Subtend Host Service Provisioning     6-5

display service statistics     2-6

E


edge switch port connection     6-1

Edit Pool button     3-5

Edit Subscriber button     3-5

entities, unlocking     5-1

F


failed trains     7-14, 7-17

far-end equipment     6-4

fields
Active Connections dialog box     7-22
ATU-C Ports tab     7-18
LIM properties     3-5
Performance Management Line Ports tab     7-17
pool properties     2-5
pool summary     7-13
Service Provisioning dialog box     4-3
subscriber     7-15
subscriber properties     3-7

G


group subscribers     2-1, 6-4

guide contents, description     xi

guidelines
for configuring ATM virtual channels     4-1
for provisioning subscribers     1-2
for setting up logical subscriber pools     2-3
for subtending     6-3
for unlocking entities     5-1

H


hardware, supported     1-2

I


idle timer     3-8

IDs
circuit     3-5, 3-7
logical pools     3-5
network VCI and VPI     4-3
network VPI     4-3
physical pool     3-5
subscriber     4-3, 7-15
subscribers     3-5, 3-7
subscriber VCI and VPI     4-3
subscriber VPI     4-3

in service
ports     2-7, 7-14

L


latency, interleaved delay     4-4

LEDs, green blinking     5-3

LIM Module Properties dialog box
Port Configuration tab     3-5

LIM ports     7-1
assigning to a logical pool     3-3
locking     1-2

LIM properties field descriptions     3-5

locked state     3-5, 3-7

locking
ATU-C ports     1-2
LIM ports     1-2

logical pools     3-3
adding     2-5
assigning LIM ports     3-3
definition     2-1
deleting     2-5
ID     3-5
steps for creating     2-7
tabs on Physical Pools dialog box     2-4

logical subscriber pools, guidelines for setting up     2-3

M


management information base
See MIB

margins, downstream and upstream     3-8

MIB     7-7

modem training sequence     7-2

Module Properties dialog box
Port Configuration tab     5-2
Usage State group box     7-19

modules, unlocking     5-4

multiband terminal algorithm     7-7

N


near cross-talk     7-10

network side     4-5

network-side uniqueness violation     4-5

node down     6-4

note, definition     xiii

O


OSRs     2-6

OSRs field     3-4

over subscription ratios
See OSRs

P


parameter exchange     7-5

path latency, interleaved delay     4-2

payload transmission rates     7-2

Performance Management dialog box
ATU-C Ports tab     7-18
Line Ports tab     7-16
Line Ports tab fields     7-17

Performance Managment dialog box
Pool Summary tab     7-13
Subscriber tab     7-15

permanent virtual channels
See PVCs

physical pools
diagram     2-2
editing     3-5
ID     3-5

Pool Properties dialog box
field descriptions     2-5
illustration and description     2-4

pool summary field descriptions     7-13

pool time     7-13

ports
assigned     2-7
associating subscribers     3-7
in service     2-7, 7-14
LIM     7-1
unlocking     5-3

power spectral density
See PSD

priority queue     4-3

provisioned pools     2-7

provisioning subscribers, guidelines     1-2

PSD, downstream and upstream values     3-8

PVCs
deleting subscribers     4-7

Q


queue priority     4-3

R


rates
payload transmission     7-2
training     3-7

ratios, OSRs     2-6

receive signal quality     7-8

S


Service Provisioning button     3-7

Service Provisioning dialog box
field descriptions     4-3
using to set VCI/VPI addresses     4-5

session in progress     7-8

session timer     3-8

states
administrative     3-5, 3-7
locked     3-5
unlocked     2-7, 3-5

statistics
line     7-17
service     2-6
subscribers     7-15

subscriberdefaults.ini
example     3-2
file     3-1

subscriber ID     3-5, 3-7, 4-3, 7-15

subscriber loop     7-1

Subscriber Properties dialog box     3-6, 4-5, 5-3, 7-5

subscriber properties fields     3-7

subscribers
adding     3-5
assigning VPI/VCI addresses     4-1
associating to ports     3-7
connection activity     7-19
defining VPI and VCI addresses     4-4
deleting PVCs     4-7
editing     3-5
group     6-4
guidelines for provisioning     1-2
line statistics     7-17
over subscribing     2-6
setting defaults     3-1
statistics     7-15
steps for adding     3-8
steps for deleting     3-10
steps for modifying     3-8
unlocking     5-2
verifying settings     5-5
VPI/VCI     4-3

subscriber side     4-5

subtended, definition     6-1

Subtend Host Service Provisioning dialog box     6-5

subtending
connections     6-2
connections, diagram     6-2
considerations     6-1
definition     6-1
guidelines     6-3
host     6-3

successful connections     7-13, 7-15

successful trains     7-14, 7-17

symbol rates     7-2

T


technicians     xi

telco     xi

threshold counters     7-11

timesaver, definition     xiii

timing
idle     3-8
session     3-8

tip, definition     xiii

total trains initiated     7-14

train counters     7-11

training     7-14
CPEs     7-7
description of process     7-5
failed trains     7-14, 7-17
max allowed downstream and upstream rates     3-7
modem sequence     7-2
successful     7-17
total initiated     7-14

transit subscribers, on Service Provisioning dialog box     6-5

U


unlocked     2-7
state     3-5
state, description     3-7

unlocking
entities     5-1
modules     5-4
ports     5-3
subscribers     5-2

V


valid address ranges     6-2

verifying subscriber settings     5-5

virtual channel identifer
See VCI

virtual path identifier
See VPI

VPI and VCI addresses
defining     4-4
steps for adding     4-5
steps for modifying     4-8

VPIs     4-5

W


warning, definition     xiii

hometocprevnextglossaryfeedbacksearchhelp
Posted: Wed Feb 16 08:26:16 PST 2000
Copyright 1989 - 2000©Cisco Systems Inc.