cc/td/doc/product/dsl_prod/vr4w/rel240
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

Connection Test Procedures for a Direct Connect Configuration

Connection Test Procedures for a Direct Connect Configuration

This appendix provides the test procedures necessary to ensure your Cisco 6100 Series system is connected correctly and is properly communicating with the ViewRunner software.

C.1 Required Equipment

To run the tests described in this appendix, you need the following equipment:

C.2 Visual Inspection

Before proceeding with the connection test procedures, inspect the chassis from the front and back.

C.2.1 Visual Inspection---Front Chassis View

To inspect the Cisco 6100 Series system from the front, verify that the multiplexer chassis (MC), fan tray, and POTS splitter chassis (PSC) (if applicable) are securely mounted to rack. Tighten the mounting screws as necessary.

C.2.2 Visual Inspection---Rear Chassis View

When you inspect the Cisco 6100 Series system from the rear, you need to complete the
following steps:

Step 1 Verify that the cables from the MC to the PSC (Direct Connect with a PSC configuration) or from the MC to the main distribution frame (MDF) (Direct Connect without a PSC configuration) are in the proper position. There should be six Champ 25-pair cables from the MC.

Step 2 Verify that all cables are as described in the Cisco 6100 Series Direct Connect
Installation Guide.

Step 3 Verify that all connectors are securely fastened (screwed in). Ensure that the Champ connectors are tie wrapped to the connector bracket. (See Figure C-1.)


Figure C-1: Cable Screwed In To Backplane With Tie Wrap


Step 4 Verify that the 10BaseT Ethernet/LAN connection is attached to the DS3system I/O card.

Step 5 Verify that the MC, fan tray, and PSC are grounded. For additional grounding information, refer to the Cisco 6100 Series Direct Connect Installation Guide.

Step 6 Verify that the following are wired to the MC from the proper sides of the fuse and
alarm panel:

Step 7 Verify that the correct fuse and alarm panel slot is wired to the MC (fuse and alarm panel slot 1).

Step 8 Verify that the proper fuse and alarm panel slot and values for both A and B power. For fuse calculation tables, refer to the Cisco 6100 Series Direct Connect Installation Guide.

Step 9 Verify that the proper voltage is present on the MC (-42 VDC to -56 VDC, nominal -48 VDC).


Note For items 8, 9, and 10, refer to the Cisco 6100 Series Direct Connect Installation Guide.

C.3 Configure the Cisco 6100 Series Management Port IP Information

Use the following steps to configure the management port IP:

Step 1 From the Windows PC, load a terminal program (such as ProComm Plus or HyperTerminal).

Step 2 Configure the program for 38.4 kbps, 8 data bits, 1 stop bit, and no parity bits

Step 3 Attach the 9-pin serial cable to the PC and the system controller (SC) module front panel 9-pin D-sub connector.

Step 4 To reset the SC module, do one of the following:

Step 5 Wait for all LEDs on the SC module to turn off.

Step 6 Once the LEDs turn off, immediately press Enter on the PC. The SC module IP configuration menu is displayed. If the SC module has already exited the self-test, you can restart by removing and reinstalling the SC module and going back to Step 3.

Step 7 Using the appropriate menu options, configure the IP address, subnet mask, and IP gateway. When configuring the server IP address, enter the address of the laptop PC that will be used to run the ViewRunner application.

Step 8 Choose the menu option to save the configuration to EEPROM.

Step 9 Choose Exit. When prompted to reset the system, enter Y and press Enter.

C.4 Attach ViewRunner Management Software to the MC

To attach ViewRunner management software to the Cisco 6100 Series system, use these steps:

Step 1 Verify that the PC that will be used during these connection test procedures has an IP address that is on the same subnet as the Cisco 6100 Series system IP address configured in the previous section.

Step 2 Unplug the 10BaseT Ethernet/LAN connection from the DS3 system I/O card and connect the PC to the DS3 system I/O card using a 10BaseT Ethernet/LAN crossover cable. Verify IP connectivity to the MC by pinging the MC from the PC.

Step 3 Load ViewRunner for Windows. Enter admin twice, once for the default username and once for the password.

Step 4 Choose Options >> 6100 Addresses from the pull-down menu.

Step 5 Type in the SC module IP address as configured in the previous section and an optional name for this system.

Step 6 Choose Add and then choose OK.

Step 7 From the drop-down list at the top of the screen, select 6100 IP address from the list of IP addresses and press Discover. This button has an icon with circular arrows and is positioned near the IP address window.

Step 8 Verify that all installed modules are properly discovered through ViewRunner. For additional information, see "Discovery," in the ViewRunner for Windows Provisioning and Operation Guide.

C.5 Provision the Cisco 6100 Series System for the Test

To provision the Cisco 6100 Series system for the test, use these steps:

Step 1 To save the current configuration of the MC to the PC, select File > Save Configuration.

Step 2 To view the current MC software version running on the MC, double-click on the SC module and look at the Module Properties Configuration dialog box in ViewRunner. If necessary, update the software on the MC. See "Updating Cisco 6100 Series System Software," in the ViewRunner for Windows Provisioning and Operation Guide for software download instructions.

Step 3 If a software update is necessary, build a new configuration of the MC. Make sure the new configuration matches the old configuration of the MC. See "Monitoring Status and Configuration," in the ViewRunner for Windows Provisioning and
Operation Guide
.

Step 4 Right-click the MC top border and select 6100 Properties > Configuration.

Step 5 Set the proper date and time and select OK.

Step 6 Verify that all installed xTU-C modules have green tabs and that all other xTU-C module slots have blue tabs. A blue tab indicates a provisioned but noninstalled module.

C.6 Test System Connectivity


Note The system connectivity test is optional. The Cisco 675 is the only CPE device that can perform bit error rate (BER) testing.

This system connectivity test is a method for testing connectivity between the Cisco 6100 Series system and the MDF for all xTU-C ports in the system. It is also known as a Zing Test.

Follow these steps to test system connectivity:

Step 1 Select the appropriate CPE device for the xTU-C modules in your system

Step 2 Attach the CPE device to the first wire pair on the subscriber side of the MDF. If 66-type punchdown blocks are used, connection can be made using a cable with alligator clips on one end and an RJ-11 connector on the other. A different cabling configuration can be required depending on the MDF type.

Step 3 Loop back the network interface port. For a DS3 network interface (NI) module, attach a short coax cable between the DS3 transmit and receive connectors to loop back the interface. For an OC-3c NI module, use a short multi-mode or single-mode fiber to loop back the interface.

Step 4 Train the CPE device to the first modem port on the MC.

Step 5 To perform a BER test on the line, use these steps:


Table C-1: Bit Field Description
7 6 5 4 3 2 1 0

GFC

VPI

VPI

VCI

VCI

VCI

VCI

PTI

CLP


Example: VPI=1, VCI=1 (GFC=0, PTI=0, CLP=0) across the ADSL loop:
NSOS>debug bert header 00100010 <Enter>

C.7 Test PPP Connectivity


Note Testing PPP connectivity is optional. The Cisco 633 does not have PPP
connectivity capabilities.

If you choose to test PPP connectivity, you will need to do the following:

Step 1 Attach the CPE device to the first wire pair on the subscriber side of the MDF. If 66-type punchdown blocks are used, connection can be made using a cable with alligator clips on one end and an RJ-11 connector on the other. A different cabling configuration can be required depending on the MDF type.

Step 2 Power on the CPE device and verify that the PPP LCP and NCP states are open after
the train.

Step 3 Move the RJ-11 jumper to the next punched line and repeat the procedure until you verify all punched lines.


hometocprevnextglossaryfeedbacksearchhelp
Posted: Mon Oct 4 14:36:49 PDT 1999
Copyright 1989-1999©Cisco Systems Inc.