cc/td/doc/product/dsl_prod/c600s/c633
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

INDEX

INDEX

A


ADSL port
connector
pinouts     A-5

ADSL port connector pinouts     A-5

ambient temperature
operational     1-7
storage     1-7

C


cabling
connecting to the network     2-6
Management Port
cabling     2-4

CBOS
logging on to     3-2
login screen     3-2

CD-ROM, document     xi

changes to NVRAM     3-3

channel support     1-5

Cisco 6100
compatible with     1-3

Cisco 676 hardware features
list of     1-3

Cisco 676 software features
list of     1-3

configuration
checklist for     2-1
default
resetting     1-6

connectors     1-6
description of     1-6
rear panel
illustration of     A-1

connectors and switches     1-6

contacting Cisco
instructions for     xvi

D


DB-9 connector
description of     1-6

DHCP Client     1-4

DHCP Server     1-4

DMT Issue 1 transmission specifications     B-3

DMT transmission specifications
table of     B-3

document CD-ROM     xi

document objectives     xi

DRAM     1-7

DSLAM     1-3

E


EDO     1-7

Ethernet connector
description of     1-6

Ethernet network
cabling to     2-6

exec and enable     3-3

I


installation
checklist for     2-1

L


logon to CBOS     3-2

M


Management Port
cabling
illustration of     2-4

Management port

pinouts     A-4
connecting to     2-4

memory
default configuration     1-7

menory
expanded
options for     1-7

O


objectives, document     xi

operating environment
ambient termperature of     1-7

operational modes     3-3

P


ports
ENET     A-1
MGMT     A-1
WALL     A-1

protocols
ARP (RFC 826)     1-4
ICMP (RFC 791)     1-4
IP (RFC 791)     1-4
UDP (RFC 792)     1-4

R


RADIUS     1-4

reset switch
location of     1-6

RFC 1483     1-5

RFC 2058, RFC 2059     1-4

RJ-11 connector     A-5

RJ-45 connector
description of     1-6

S


security and accounting     1-4

serial port
configuring     2-5

software features     1-3

specifications
ADSL Interface     B-2
dimensions     B-1
FCC Part 15 Statement     B-4
FCC statement     B-4
Management Interface     B-1
Operating Requirements     B-2
Power Requirements     B-2
Regulatory Approvals     B-3
weight     B-1

SpeedRunner 203
features
list of     1-3

standards
ANSI T1.413 Issue 1     1-3
ATM Forum UNI Version 3.1 PVC     1-4
IEEE 802.1d     1-4
IETF RFC 1483 encapsulation AAL5     1-3
IETF RFC 1661 Point-to-Point Protocol     1-3
RFC 1638 - BC     1-4

switches     1-6

V


virtual circuits     1-3

hometocprevnextglossaryfeedbacksearchhelp
Posted: Mon Jan 10 12:58:32 PST 2000
Copyright 1989-2000©Cisco Systems Inc.