Configuration Worksheets

This appendix includes checklists, instructions, examples, and blank worksheets used for the initial installation and maintenance of the LightStream 1010 ATM switch. The checklists, worksheets, and log provide reference and history information that may be useful when troubleshooting the switch in the future.

Following is a list of worksheets in this appendix:

Make copies of these worksheets before continuing, so that you can complete each of the forms and keep them in a safe place for future reference in the permanent site record.

Switch Installation Checklist

Use the Switch Installation Checklist to confirm that you have all the information needed to install and configure the LightStream 1010 ATM switch, and that all the components are installed and operating correctly. Each task in the Switch Installation Checklist should be verified by the person performing the installation and then dated for the permanent site record.


Table  A-1: Switch Installation Checklist
Task Verified by Date
Date switch received
Switch and all components unpacked
Chassis components verified
Safety recommendations reviewed
Installation Checklist copied
Site Log established and background information entered
Site power voltages verified
Site environmental specifications verified
IP addresses (if needed) assigned
Required tools available
Network connection equipment available
Switch mounted in rack
Second (optional) power supply installed
AC power supplies connected to AC sources
(separate lines if required)
All ejector levers checked and secure
Captive installation screws on supervisor engine module; line modules and power supplies checked
Interface cables and devices connected
ASCII1 terminal attached to the console port
Console port set for 9600 baud, 8 data bits, 2 stop bits, no parity
All power supplies turned ON
PS1 and PS2 power LEDs on for all power supplies
System boot complete (normal LEDs)
ASP2 module operational (status LED on ASP green)

1 ASCII = American Standard Code for Information Interchange
2 ASP = ATM switch processor

Switch Component Checklist

Use the Switch Component Checklist in Table A-2 to verify that all hardware and documentation items needed to complete this installation have been received before starting the installation process. Each component in the Switch Component Checklist should be verified by the person unpacking the equipment, and the list should be kept for the permanent site record.


Table A-2: Switch Component Checklist
Component Description Received
Chassis Switch chassis
Accessory Box(es):
Power cables One power cable for each power supply received (may be shipped separately)

Other optional equipment

Optional second power supply for redundant power feature
Ethernet transceiver

Documentation1

Unpacking Instructions
LightStream 1010 ATM Switch Hardware Installation Guide
LightStream 1010 ATM Switch ASP
Installation Guide
LightStream 1010 ATM Switch PAM
Installation Guide
Software license agreement
System Components:
ATM switch processor module (ASP) Installed in slot 2
155 UTP5 port adapter module (PAM)
(unshielded twisted-pair)
Enter slot location and port addresses on the
Port Configuration Worksheet
155 MM PAM
(multimode fiber)
Enter slot location and port addresses on the
Port Configuration Worksheet
155 SM PAM
(single-mode fiber)
Enter slot location and port addresses on the
Port Configuration Worksheet
155 SM/MM PAM
(single-mode and multimode fiber)
Enter slot location and port addresses on the
Port Configuration Worksheet
155 LR PAM
(single-mode long-reach)
Enter slot location and port addresses on the
Port Configuration Worksheet
1622 MM PAM
(multimode fiber)
Enter slot location and port addresses on the
Port Configuration Worksheet
622 SM PAM
(single-mode fiber)
Enter slot location and port addresses on the
Port Configuration Worksheet
622 LR PAM
(single-mode long-reach)
Enter slot location and port addresses on the
Port Configuration Worksheet
DS-3 (Quad) PAM Enter slot location and port addresses on the
Port Configuration Worksheet
DS-3 PAM Enter slot location and port addresses on the
Port Configuration Worksheet
E3 PAM Enter slot location and port addresses on the
Port Configuration Worksheet
T1 DSX1 PAM Enter slot location and port addresses on the
Port Configuration Worksheet
E1 DSX1 PAM Enter slot location and port addresses on the
Port Configuration Worksheet
E1 75-ohm PAM Enter slot location and port addresses on the
Port Configuration Worksheet
CES T1 PAM Enter slot location and port addresses on the
Port Configuration Worksheet
CES T1 120-PAM Enter slot location and port addresses on the
Port Configuration Worksheet
CES T1 75-PAM Enter slot location and port addresses on the
Port Configuration Worksheet

1 Documentation no longer ships by default. You must specify the type and quantity of documentation sets when you order the hardware. Documentation is also available on the Cisco Connection, Enterprise CD.

Port Configuration Worksheet

Use the Port Configuration Worksheet during the software configuration process. Each heading in the Port Configuration Worksheet should be completed by the person configuring the switch and kept for the permanent site record. This section contains a sample LightStream 1010 ATM switch configuration and the corresponding port configuration forms.

Switch Configuration Example

An example LightStream 1010 ATM switch configuration is shown in Figure A-1. The example configuration includes the following elements:


Figure A-1: Sample LightStream 1010 ATM Switch Configuration



Slot Sub. Card PAM Type

0

0

155 SM

0

1

155 MM

1

0

155 UTP

1

1

155 UTP

2

-

ASP

3

0

DS-3

3

1

E3

4

0

622 SM

4

1

622 SM

Figure A-2 displays example switch information, and Table A-3 is the completed Sample Port Configuration Worksheet for this switch.


Figure A-2: Sample Switch Information




Table A-3: Sample Port Configuration Worksheet
Slot/PAM/Port No. PAM Type Name

0/0/0

155 SM

Bldg 1

0/0/1

155 SM

Bldg 2

0/0/2

155 SM

Bldg 3

0/0/3

155 SM

Bldg 4

0/1/0

155 MM

Floor 1

0/1/1

155 MM

Floor 2

0/1/2

155 MM

Floor 3

0/1/3

155 MM

Floor 4

1/0/0

155 UTP

Server 1

1/0/1

155 UTP

Server 2

1/0/2

155 UTP

Server 3

1/0/3

155 UTP

Server 4

1/1/0

155 UTP

Server 5

1/1/1

155 UTP

Server 6

1/1/2

155 UTP

Server 7

1/1/3

155 UTP

Server 8

Ethernet

ASP

Ethernet Port (10 Mbps)

AUX 0

ASP

Console 0

ASP

3/0/0

DS-3

Domestic 1

3/0/1

DS-3

Domestic 2

3/0/2

NA

NA

3/0/3

NA

NA

3/1/0

E-3

Europe 1

3/1/1

E-3

Europe 2

3/1/2

NA

NA

3/1/3

NA

NA

4/0/0

622 SM

HS-1

4/0/1

NA

NA

4/0/2

NA

NA

4/0/3

NA

NA

4/1/0

622 SM

HS-2

4/1/1

NA

NA

4/1/2

NA

NA

4/1/3

NA

NA

Port Configuration Worksheet Master

You should fill out the blank Port Configuration Worksheet (Table A-4) before starting to configure the LightStream 1010 ATM switch.


Figure A-3: Switch Information




Table A-4: Port Configuration Worksheet
Slot/PAM/Port No. PAM Type Name

0/0/0

0/0/1

0/0/2

0/0/3

0/1/0

0/1/1

0/1/2

0/1/3

1/0/0

1/0/1

1/0/2

1/0/3

1/1/0

1/1/1

1/1/2

1/1/3

Ethernet

ASP

Ethernet Port (10 Mbps)

AUX 0

ASP

Console 0

ASP

3/0/0

3/0/1

3/0/2

3/0/3

3/1/0

3/1/1

3/1/2

3/1/3

4/0/0

4/0/1

4/0/2

4/0/3

4/1/0

4/1/1

4/1/2

4/1/3

Site Log

Use the Site Log (Table A-5) to keep a maintenance history of the switch. A detailed description of actions performed and symptoms observed should be completed by the person performing the maintenance and kept as part of the permanent site record.


Table  A-5: Site Log
Date Action Performed or Symptom Observed Initial

Quick Installation Worksheet

The installation and configuration of the LightStream 1010 ATM switch can be separated into specific steps. If each step described in the Port Configuration Worksheet (Table A-4) is completed, switch installation should be successful. If the LightStream 1010 ATM switch fails to function properly in the first attempt, you can use the Quick Installation Worksheet to systematically check that each step was performed correctly.

Copy the Quick Installation Worksheet and initial each procedure as it is completed. Each task should be verified by the person performing the installation and dated for the permanent site record.


Table  A-6: Quick Installation Worksheet
Task Completed Date
Complete Switch Installation Checklist
Complete Switch Component Checklist
Complete Port Configuration Worksheets
Rack-mount the switch
Connect cables
Connect power cables
Switch power on
Configure IP address (optional)
Configure ATM address (optional)
Configure line (auxiliary or console)
Configure SNMP
Set clock (optional)
Test the configuration
Store configuration