cc/td/doc/product/atm/ls1010s/wa5/12/7_15c
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

INDEX

INDEX

A


AC power
connecting     A-9
installing power supply     A-5
removing power supply     A-5
requirements     2-8
specifications     B-2

additional documentation     xiii

airflow diagram     2-14

airflow, chassis     2-14

altitude     2-15

ASP
See processor card

ATM switch processor
See ASP

audience for manual     xii

B


backbone configuration example     1-3

C


cable guides, installing     2-22

cables, connecting     2-25

carrier module
documentation     xiii
installing     A-1
removing     A-1

cautions, conventions     xiii

chassis     2-3, C-9
airflow     2-14
diagnostic tests     2-26
diagram     1-1
dimensions     B-1
example applications     1-2
installation     2-1
lifting safely     2-3
maintenance procedures     A-1
rack-mounting     2-18
replacing components     A-1
replacing fan assembly     A-19
slots     1-2
specifications     B-1

command description syntax     xiii

components, replacing     A-1

confirming installation     2-25

connections, network     2-17

conventions for manual     xiii

D


DC power
connecting     A-15
connecting redundant     A-17
powering up     A-18
requirements     2-8
specifications     B-2

diagnostics     2-26

dimensions, chassis     B-1

document
audience     xii
conventions     xiii
objectives     xii
organization     xii

E


electricity
interference considerations     2-10
safety warnings     2-5

electrostatic discharge, preventing damage     2-6

EMI shielding     2-6

environment, site     2-13

equipment racks
installing chassis     2-22
L brackets     2-20
mounting switch     2-18
ventilation     2-16

ESD, preventing damage     2-6

example switch applications     1-2

F


fan assembly, replacing     A-19

H


hardware reset diagnostics     2-26

humidity     2-15

I


installation
cable guides     2-22
confirming     2-25
L brackets     2-20
placing chassis in rack     2-22
preparation     2-1
site requirements     2-8
tools required     2-19
troubleshooting     2-26

installing components
AC power supply     A-5
carrier modules     A-1
fan assembly     A-19
power supplies     A-2
processor card     A-1

interference     2-10

L


L brackets, installing     2-20

LANE configuration example     1-4

laying out site     2-16

LEDs
power supply     A-2
processor card power supply     A-3

lifting the chassis     2-3

locating site     2-16

M


maintaining the switch     A-1

mounting switch in rack     2-18

MSRP
See processor card

multiservice switch route processor
See MSRP

multisite configuration example     1-4

N


network connections, preparing     2-17

notes, conventions     xiii

O


objectives, document     xii

organization of manual     xii

overtemperature protection, power supply     A-4

overvoltage protection, power supply     A-4

P


port adapter
additional documentation     xiii
definition     1-2
installing     A-1
removing     A-1

power
connecting     2-25
precautions     2-17
requirements     2-8
supply
AC specifications     B-2
DC specifications     B-2
installing     A-2
LEDs     A-2
overtemperature and overvoltage protection     A-4
removing     A-2

preparing for installation     2-1

processor card
additional documentation     xiii
definition     1-2
hot swappable     2-5, A-2
installing     A-1
power supply LEDs     A-3
removing     A-1

R


rack-mounting the switch     2-18

related documentation     xiii

removing components
AC power supply     A-5
carrier modules     A-2
fan assembly     A-19
port adapters     A-2
processor card     A-2

removing power supplies     A-2

replacing switch components     A-1

RFI     2-10

S


safety
recommendations
general     2-2
working with electricity     2-5
warnings, translated     C-1

screen example conventions     xiii

show diag power-on command     2-26

show environment command     A-18

site
configuration     2-16
environment     2-13
requirements
altitude     2-15
humidity     2-15
location     2-16
power     2-8
temperature     2-13, 2-15
ventilation     2-13

software configuration, additional documentation     xiii

specifications
AC power supply     B-2
chassis     B-1
DC power supply     B-2
temperature ranges     2-15

stack     2-3, C-9

switch applications, examples     1-2

T


temperature ranges     2-15

tools required for installation     2-19

translated safety warnings     C-1

troubleshooting flowchart     2-26

V


ventilation, equipment racks     2-16

verifying installation     2-25

VP tunneling example     1-5

W


warnings
conventions     xiii
translated     C-1

wiring interference     2-10

workgroup configuration example     1-2

hometocprevnextglossaryfeedbacksearchhelp
Posted: Mon May 8 19:30:06 PDT 2000
Copyright 1989 - 2000©Cisco Systems Inc.