- AC power
- connecting 4-8
- connecting redundant 4-9
- installing power supply 4-5
- powering on 4-10
- removing power supply 4-5
- requirements 2-7
- specifications B-2
- additional documentation xviii
- airflow diagram 2-13
- airflow, chassis 2-13
- altitude 2-14
- ASP
- additional documentation xviii
- definition 1-2
- installing 4-2
- power supply LEDs 4-3
- removing 1-8, 4-2
- ATM address, switch 3-1
- ATM switch processor
- See ASP
- audience for manual xv
- backbone configuration example 1-5
- cable guides, installing 2-25
- cables, connecting 2-28
- carrier module
- See CM
- cautions, conventions xvi
- CD-ROM documentation xiii
- chassis
- airflow 2-13
- diagnostic tests 2-29
- diagram 1-1
- dimensions B-1
- installing in rack 2-25
- lifting safely 2-2
- powering up 3-2
- rack-mounting 2-21
- repacking 2-18
- replacing fan assembly 4-20
- slots 1-2
- specifications B-1
- CM
- installing 4-2
- removing 4-2
- command description syntax xv
- components, replacing 4-1
- configuration worksheets A-1
- configuring the switch 3-1
- confirming installation 2-28
- connecting interface cables 2-28
- connection types supported 1-2
- connections, network 2-16
- conventions for manual xv
- DC power
- connecting 4-17
- connecting redundant 4-19
- installing power supply 4-10
- powering on 4-19
- removing power supply 4-10
- requirements 2-7
- specifications B-2
- voltage thresholds 1-8
- diagnostics 2-29
- dimensions, chassis B-1
- document
- audience xv
- conventions xv
- objectives xiii
- organization xiv
- documentation
- additional xviii
- CD-ROM xiii
- World Wide Web xiii
- electricity
- interference considerations 2-9
- safety warnings 2-4
- electrostatic discharge, preventing damage 2-5
- EMI shielding 2-5
- environment, site 2-12
- environmental monitoring 1-8
- equipment racks
- installing chassis 2-25
- L brackets 2-22
- mounting switch 2-21
- ventilation 2-15
- ESD, preventing damage 2-5
- example switch applications 1-4
- example switch configuration A-5
- fan assembly, replacing 4-20
- feature summary 1-2
- functional overview, hardware 1-7
- hardware functional overview 1-7
- hardware reset diagnostics 2-29
- hot-swapping PAMs 1-8
- humidity 2-14
- installation
- cable guides 2-25
- confirm part and serial numbers 3-4
- confirming 2-28
- L brackets 2-22
- placing chassis in rack 2-25
- power-up display 3-3
- preparation 2-1
- Quick Installation Worksheet A-12
- site requirements 2-7
- Switch Installation Checklist A-1
- tools required 2-22
- troubleshooting 2-30
- worksheets A-1
- installing components
- AC power supply 4-5
- ASP, CMs, and PAMs 4-2
- DC power supply 4-10
- fan assembly 4-20
- power supplies 4-2
- interference 2-9
- L brackets, installing 2-22
- LANE configuration example 1-6
- laying out site 2-15
- LEDs
- ASP power supply 4-3
- power supply 4-2
- lifting the chassis 2-2
- LightStream 1010
- chassis 1-1
- environmental monitoring 1-8
- example applications 1-4
- example configuration A-5
- feature summary 1-2
- hardware functional overview 1-7
- initial configuration 3-1
- installation 2-1
- lifting the chassis 2-2
- maintenance procedures 4-1
- rack-mounting 2-21
- replacing components 4-1
- slots 1-2
- specifications B-1
- locating site 2-15
- maintaining the switch 4-1
- maintenance log A-11
- monitoring, environmental 1-8
- mounting switch in rack 2-21
- multisite configuration example 1-6
- network connections, preparing 2-16
- notes, conventions xvi
- objectives, document xiii
- organization of manual xiv
- other documentation xviii
- overtemperature protection, power supply 4-4
- overvoltage protection, power supply 4-4
- PAM
- additional documentation xviii
- definition 1-2
- hot-swapping 1-8
- installing 4-2
- port density 1-8
- removing 4-2
- port adapter module
- See PAM
- Port Configuration Worksheets
- blank A-9
- example A-5
- port density, PAM 1-8
- power
- connecting 2-28
- precautions 2-16
- power requirements 2-7
- power supply
- AC specifications B-2
- DC specifications B-2
- installing 4-2
- LEDs 4-2
- overtemperature and overvoltage protection 4-4
- removing 4-2
- voltage monitoring 1-8
- powering up the system 3-2
- power-up display 3-3
- preparing for installation 2-1
- Quick Installation Worksheet A-12
- rack-mounting the switch 2-21
- related documentation xviii
- removing components
- AC power supply 4-5
- ASP, CMs, and PAMs 4-2
- DC power supply 4-10
- fan assembly 4-20
- removing power supplies 4-2
- repacking the system 2-18
- replacing switch components 4-1
- RFI 2-9
- safety recommendations
- general 2-2
- working with electricity 2-4
- safety warnings, translated C-1
- screen example conventions xv
- service categories, supported 1-3
- show diag power-on command 2-29
- show environment command 4-10, 4-19
- show hardware command 3-4
- site configuration 2-15
- site environment 2-12
- Site Log A-11
- site requirements
- altitude 2-14
- humidity 2-14
- location 2-15
- power 2-7
- temperature 2-12, 2-14
- ventilation 2-12
- SNMP network management 3-1
- software configuration
- additional documentation xviii
- specifications
- AC power supply B-2
- chassis B-1
- DC power supply B-2
- temperature ranges 2-14
- supported connection types 1-2
- supported service categories 1-3
- switch applications, examples 1-4
- Switch Component Checklist A-3
- Switch Installation Checklist A-1
- Telnet 3-1
- temperature
- monitoring 1-8
- ranges 2-14
- thresholds 1-8
- tools required for installation 2-22
- translated safety warnings C-1
- troubleshooting flowchart 2-30
- ventilation, equipment racks 2-15
- verifying installation 2-28
- voltage monitoring 1-8
- voltage thresholds, DC 1-8
- VP tunneling example 1-7
- warnings
- conventions xvi
- translated C-1
- wiring interference 2-9
- workgroup configuration example 1-4
- worksheets
- Port Configuration Worksheet A-5
- Quick Installation Worksheet A-12
- Site Log A-11
- Switch Component Checklist A-3
- Switch Installation Checklist A-1
- World Wide Web documentation xiii
Copyright 1989-1999
©
Cisco Systems Inc.