hometocprevnextglossaryfeedbacksearchhelp
Search below for:

INDEX

A


AC power
connecting          4-8
connecting redundant          4-9
installing power supply          4-5
powering on          4-10
removing power supply          4-5
requirements          2-7
specifications          B-2

additional documentation          xviii

airflow diagram          2-13

airflow, chassis          2-13

altitude          2-14

ASP
additional documentation          xviii
definition          1-2
installing          4-2
power supply LEDs          4-3
removing          1-8, 4-2

ATM address, switch          3-1

ATM switch processor
See ASP

audience for manual          xv

B


backbone configuration example          1-5

C


cable guides, installing          2-25

cables, connecting          2-28

carrier module
See CM

cautions, conventions          xvi

CD-ROM documentation          xiii

chassis
airflow          2-13
diagnostic tests          2-29
diagram          1-1
dimensions          B-1
installing in rack          2-25
lifting safely          2-2
powering up          3-2
rack-mounting          2-21
repacking          2-18
replacing fan assembly          4-20
slots          1-2
specifications          B-1

CM
installing          4-2
removing          4-2

command description syntax          xv

components, replacing          4-1

configuration worksheets          A-1

configuring the switch          3-1

confirming installation          2-28

connecting interface cables          2-28

connection types supported          1-2

connections, network          2-16

conventions for manual          xv

D


DC power
connecting          4-17
connecting redundant          4-19
installing power supply          4-10
powering on          4-19
removing power supply          4-10
requirements          2-7
specifications          B-2
voltage thresholds          1-8

diagnostics          2-29

dimensions, chassis          B-1

document
audience          xv
conventions          xv
objectives          xiii
organization          xiv

documentation
additional          xviii
CD-ROM          xiii
World Wide Web          xiii

E


electricity
interference considerations          2-9
safety warnings          2-4

electrostatic discharge, preventing damage          2-5

EMI shielding          2-5

environment, site          2-12

environmental monitoring          1-8

equipment racks
installing chassis          2-25
L brackets          2-22
mounting switch          2-21
ventilation          2-15

ESD, preventing damage          2-5

example switch applications          1-4

example switch configuration          A-5

F


fan assembly, replacing          4-20

feature summary          1-2

functional overview, hardware          1-7

H


hardware functional overview          1-7

hardware reset diagnostics          2-29

hot-swapping PAMs          1-8

humidity          2-14

I


installation
cable guides          2-25
confirm part and serial numbers          3-4
confirming          2-28
L brackets          2-22
placing chassis in rack          2-25
power-up display          3-3
preparation          2-1
Quick Installation Worksheet          A-12
site requirements          2-7
Switch Installation Checklist          A-1
tools required          2-22
troubleshooting          2-30
worksheets          A-1

installing components
AC power supply          4-5
ASP, CMs, and PAMs          4-2
DC power supply          4-10
fan assembly          4-20
power supplies          4-2

interference          2-9

L


L brackets, installing          2-22

LANE configuration example          1-6

laying out site          2-15

LEDs
ASP power supply          4-3
power supply          4-2

lifting the chassis          2-2

LightStream 1010
chassis          1-1
environmental monitoring          1-8
example applications          1-4
example configuration          A-5
feature summary          1-2
hardware functional overview          1-7
initial configuration          3-1
installation          2-1
lifting the chassis          2-2
maintenance procedures          4-1
rack-mounting          2-21
replacing components          4-1
slots          1-2
specifications          B-1

locating site          2-15

M


maintaining the switch          4-1

maintenance log          A-11

monitoring, environmental          1-8

mounting switch in rack          2-21

multisite configuration example          1-6

N


network connections, preparing          2-16

notes, conventions          xvi

O


objectives, document          xiii

organization of manual          xiv

other documentation          xviii

overtemperature protection, power supply          4-4

overvoltage protection, power supply          4-4

P


PAM
additional documentation          xviii
definition          1-2
hot-swapping          1-8
installing          4-2
port density          1-8
removing          4-2

port adapter module
See PAM

Port Configuration Worksheets
blank          A-9
example          A-5

port density, PAM          1-8

power
connecting          2-28
precautions          2-16

power requirements          2-7

power supply
AC specifications          B-2
DC specifications          B-2
installing          4-2
LEDs          4-2
overtemperature and overvoltage protection          4-4
removing          4-2
voltage monitoring          1-8

powering up the system          3-2

power-up display          3-3

preparing for installation          2-1

Q


Quick Installation Worksheet          A-12

R


rack-mounting the switch          2-21

related documentation          xviii

removing components
AC power supply          4-5
ASP, CMs, and PAMs          4-2
DC power supply          4-10
fan assembly          4-20

removing power supplies          4-2

repacking the system          2-18

replacing switch components          4-1

RFI          2-9

S


safety recommendations
general          2-2
working with electricity          2-4

safety warnings, translated          C-1

screen example conventions          xv

service categories, supported          1-3

show diag power-on command          2-29

show environment command          4-10, 4-19

show hardware command          3-4

site configuration          2-15

site environment          2-12

Site Log          A-11

site requirements
altitude          2-14
humidity          2-14
location          2-15
power          2-7
temperature          2-12, 2-14
ventilation          2-12

SNMP network management          3-1

software configuration
additional documentation          xviii

specifications
AC power supply          B-2
chassis          B-1
DC power supply          B-2
temperature ranges          2-14

supported connection types          1-2

supported service categories          1-3

switch applications, examples          1-4

Switch Component Checklist          A-3

Switch Installation Checklist          A-1

T


Telnet          3-1

temperature
monitoring          1-8
ranges          2-14
thresholds          1-8

tools required for installation          2-22

translated safety warnings          C-1

troubleshooting flowchart          2-30

V


ventilation, equipment racks          2-15

verifying installation          2-28

voltage monitoring          1-8

voltage thresholds, DC          1-8

VP tunneling example          1-7

W


warnings
conventions          xvi
translated          C-1

wiring interference          2-9

workgroup configuration example          1-4

worksheets
Port Configuration Worksheet          A-5
Quick Installation Worksheet          A-12
Site Log          A-11
Switch Component Checklist          A-3
Switch Installation Checklist          A-1

World Wide Web documentation          xiii

hometocprevnextglossaryfeedbacksearchhelp
Copyright 1989-1999 © Cisco Systems Inc.